Before any build begins, we clear, level and prepare the site so your builder can start with confidence. That includes cut and fill, compaction and getting services access sorted before the first slab is poured.

Site preparation is the one job where being fifty millimetres out costs somebody real money. BD Excavation Services prepares building sites across the Gold Coast and hinterland with the levels set out and checked by a qualified surveyor before the machine starts, so the pad you get matches the reduced level on the drawings rather than something close to it. We handle house pads, shed and garage pads, tank bases and general cut and fill, working out the balance first so you are not paying to truck soil off a block that could have used it. Ring 1300 206 751 to talk through your plans and get a free quote.

A properly set-out site gives the trades that follow you a pad they can trust. Formwork crews are not chasing levels, the slab sits at the height the drainage design assumed, and the finished floor level relates correctly to the driveway and the yard. We keep the pad drained while it is open so a week of rain does not turn it into a bathtub, batter or retain the high side rather than leaving a raw face, and place and compact fill in layers where the design allows it. Service trenches and access for the build are sorted at the same time, and survey marks stay on site so anyone can check the work independently.

Frequently asked

What is the difference between cut and fill?
Cut is the material taken out of the high side of a slope; fill is that material placed and compacted on the low side. Balancing the two on site avoids truck movements and is usually the cheapest way to get a level pad.
Can a house be built on filled ground?
Only if the fill is placed in layers and compacted to specification, and even then footings often need to reach undisturbed material below. Your engineer nominates what is acceptable and we build to that detail.
How much slope can a building site handle?
Steep blocks are routine here — the limiting factor is usually machine access and what happens to the exposed batter, not the fall itself. More fall simply means more cut volume and a retaining solution on the high side.